Adaptation of the mooring and docking system at the Enagás pontoon in Huelva
Huelva, Spain
These works took place on the Enagás inflammables pontoon at its Huelva regasification plant.
The pontoon had seven mooring dolphins and five docking dolphins. In order to increase the capacity of ships able to access the plant, DRACE GEOCISA reinforced some of the existing dolphins and built three new ones. On the reinforced dolphins, the existing fast-release hooks were replaced with new larger-capacity ones.